5. Mark the lower attachment point, remove the unit and drill the hole in the wall. Install the unit again and
fix the bottom attachment using a suitable fastening element. Said hole has a diameter of 7.5 mm.
6. Check that the unit is properly secured.
Once the unit has been installed correctly, the connection process will begin.
Make the connections in the following order:
1. Connection of accessories (optional).
2. AC connection.
3. DC connection.
It is mandatory to follow the order described above. Do not switch on the power until you have made
all the connections and closed the unit.
6.3. Opening and closing the housing
To install the equipment it is not necessary to open the housing unless you wish to modify the ground
connection or install an accessory.
77
Installing the unit
Ingeteam
ABE2011IQM01_C - Installation and Operation Manual
DE
EN
ES
FR
IT
PT
Summary of Contents for INGECON SUN 1Play TL M
Page 58: ...Anmerkungen Notes Notas Remarques Note Notas...
Page 108: ...Anmerkungen Notes Notas Remarques Note Notas...
Page 309: ...Anmerkungen Notes Notas Remarques Note Notas...
Page 310: ...Anmerkungen Notes Notas Remarques Note Notas...
Page 312: ...Ingeteam Power Technology S A www ingeteam com ABE2011IQM01_C 06 2016...