The four upper drilled holes are made first. The measurements to be used are shown in the figure. The bottom hole
must be drilled when the unit is hung on the wall. The figure also shows the approximate distances between the
horizontal line formed by the four upper drilled holes and where the bottom hole will be.
Installation Manual
INGECON
®
SUN SMART TL
AAY2000IKI03
AAY2000IKI03
Rev. _
Date: March 2011
Page 27 of 64
27 of 64
of 64