Pre-Installation
The final position for the air handler must be dictated by required service access to it, weight
distribution over structural supports, and by the locations of electrical, refrigerant and condensate
drainage connections. After this is determined, the following preparations should be made.
Repositioning Drain Pan
These air handlers come with one drain pan that can be installed in any one of four positions; this
allows for vertical or horizontal application and right or left condensate line connection. The drain
pan can also be easily removed for periodic cleaning.
Note:
Important! All air handlers are shipped with the drain pan installed in the horizontal position
and the connection on the left side (as shown in
Figure 1
. If an alternate position is required,
the drain pan should be repositioned before setting the air handler.
Figure 1.
Drain Pan Location