DECOMMISSIONING THE INTEGRATED DRYER

Decommission the dryer and the relevant packaging in compliance with the rules locally in force.

Pay particular attention to the refrigerant, as it contains part of the refrigerating compressor lubricating oil.

Contact a waste disposal and recycling utility.

Table 7: Integrated Dryer Materials of Construction

RECYCLING DISASSEMBLY

Frame and panels

Steel / epoxy resin polyester

Heat exchanger (cooler)

Stainless steel / aluminum

Pipes

Copper

Insulation

Gum synthetic

Compressor

Steel / copper / aluminum 
/ oil

Condenser

Aluminum

Refrigerant

R134a

Valve

Steel

„

RELEASED 11/Feb/2019 01:43:20 GMT

Summary of Contents for RS45i

Page 1: ...47612267 Revision B January 2019 Save These Instructions Contact Cooled Rotary Screw Air Compressor Product Maintenance Information RS45i RS55i RS75i RELEASED 11 Feb 2019 01 43 20 GMT...

Page 2: ...REGREASING MOTOR 7 CLEANING AIR COOLED COOLING SYSTEM 7 REMOVING INSTALLING AIR COOLED COOLER 8 CLEANING WATER COOLED COOLER FOR BOTH CLEAN HARSH WATER OPTIONS 8 CLEANING MOTOR COWL 8 CLEANING CHECKIN...

Page 3: ...nt training and experience to accomplish correctly In such situations only allow Ingersoll Rand trained technicians to perform maintenance on this compressor Service or inspections beyond the procedur...

Page 4: ...hours Analysis Food grade Lubricant Ultra FG Every 2000 hours Inspect Air filter element Inspect Coolant filter element Inspect Starter box power drive module PDM filter element Analysis Shock pulse b...

Page 5: ...unscrew the coolant fill plug to verify all pressure has been released 5 Add coolant 6 Replace the coolant fill plug and restart the compressor 7 Recheck the coolant level 8 Repeat the above steps unt...

Page 6: ...posite the pivot bolt which should be left engaged by 2 3 threads with at least 6 5 mm 0 25 in clearance from the screw head to the cover Rotate the jacking bolt clockwise until the cover lifts off th...

Page 7: ...om the compressor for testing If operating conditions are particularly severe the frequency of testing and maintenance shall be increased accordingly The user shall establish the frequency of such tes...

Page 8: ...es to fully de pressurize once stopped 4 Ensure that the main power disconnect switch is locked off and tagged 5 Install cooler mounting connection at both sides of cooling sheet metal plenum and keep...

Page 9: ...ter grill 4 Pull out the filter element 5 Center the new element over the package intake opening Also note that the filter is washable with mild detergent 6 Push the filter over the grill studs so tha...

Page 10: ...or not sized to meet system requirements or requirements have been changed Contact your local Ingersoll Rand representative Air loss due to pipe hose joint or seal failure Repair or replace Air loss d...

Page 11: ...Replace Incorrect coolant has been added Drain system check for damage Clean refill with correct coolant System has been overfilled with coolant Check for damage drain excess Discharge air is contamin...

Page 12: ...or temperature Insufficient cooling taking place If compressor is watercooled or sea watercooled check that the cooling water is flowing Check that there is no air in the water cooling system Check th...

Page 13: ...in the strainer body before replacing the filter screen 5 Replace plug and tighten with wrench 6 When putting the valve back into service press the TEST button to confirm proper function TESTING CONDE...

Page 14: ...t of the refrigerating compressor lubricating oil Contact a waste disposal and recycling utility Table 7 Integrated Dryer Materials of Construction RECYCLING DISASSEMBLY Frame and panels Steel epoxy r...

Page 15: ...RELEASED 11 Feb 2019 01 43 20 GMT...

Page 16: ...ingersollrandproducts com 2019 Ingersoll Rand RELEASED 11 Feb 2019 01 43 20 GMT...

Reviews: