
20
General Information
1.6.2
Mechanical Connections
Fig. 3
Removing the transportation lock before starting
Before installation remove the transportation lock.
In order to ensure adequate ventilation of the Protec P3000, a space of at
least 20 cm 8) (8 in.) must be kept unobstructed to the sides. The clearance
at the rear must be no less than 10 cm (4 in.). Moreover, the Protec P3000
handles for carrying the leak detector at the sides of the main unit must not
be covered at any time as these acts as air inlet and outlet. Avoid the
presence of heat sources in the vicinity of the Protec P3000.
Place the device where you can always reach the mains switch or mains
plug.
Twisting the sniffer line spoils the cable.
Do not twist the sniffer line.
Summary of Contents for Protec P3000
Page 2: ......
Page 10: ...10 General Safety Precautions...
Page 121: ...CE Declaration of Conformity 121 9 CE Declaration of Conformity Fig 91...
Page 122: ...122 CE Declaration of Conformity...
Page 125: ...Appendix 125...
Page 126: ......
Page 127: ......
Page 128: ......