NetTEST II Menu Guide
8
©
COMSOFT
5.2 Main Menu
The main menu automatically appears on the display after
having started the
NetTEST II
.
Figure 3:
Screen ‘Main menu’
The main menu comprises the following submenus:
•
Line Test
•
Test without PLC
Stepwise check of cabling and test of DP Slaves,
without protocol generation.
•
PROFIBUS Master mode
(optional)
Set into operation of DP Slaves without PLC.
•
Test with PLC
(optional)
Detailed analysis of the telegram traffic and the
physical state of the PROFIBUS line.
•
Test Protocol
•
Test without PLC
Like
Line Test – Test without PLC
, however, the
results of all tests are stored in a test protocol for
documentation purposes.
•
Test with PLC
(optional)
Like
Line Test – Test with PLC
, however, the results
of all tests can be stored in a test protocol for
documentation purposes.
•
System Configuration
For all device-specific settings.
•
GSD - library
Submenu for the administration of GSD files.
Summary of Contents for NetTEST II
Page 1: ......