156
TR
SI
CZ
HU
RO
PL
RU
UA
SK
ES
IE
3.8 POSSIBLE ADJUSTMENTS.
N.B.:
to adjust the gas valve, remove the plastic
cap (6); after adjusting, refit the cap.
• Preliminary calibration operations.
- Set parameter P4 at 0 %.
- Set parameter P5 at 99 %.
• Activate the chimney sweep function.
- Enter the “DHW chimney sweep” mode,
opening a DHW cock.
• Adjustment of boiler nominal thermal heat
output.
- Set the maximum output (99%) using the
buttons (5 and 6 Fig. 2-1).
- Adjust the boiler nominal power on the brass
nut (3 Fig. 3.3), keeping to the maximum
pressure values stated in the tables (Par. 3.18)
according to the type of gas; by turning
clockwise the heat potential increases, anti-
clockwise it decreases.
• Adjustment of boiler minimum thermal heat
output.
N.B.:
only proceed after having calibrated the
nominal pressure.
- Set the minimum output (0%) always using
the buttons (5 and 6 Fig. 2-1).
- Adjust the minimum thermal input by op-
erating on the cross plastic screws (2) on the
gas valve maintaining the brass nut blocked
(3);
• Exit the “Chimney sweep” mode and keep the
boiler functioning.
• Adjustment of the boiler minimum heat output
in heating phase.
N.B.:
only proceed after having calibrated the
minimum boiler pressure.
- To adjust the minimum heat output during
the heating phase, change parameter (P4),
increasing the value the pressure increases,
reducing it the pressure drops.
- The pressure to which the boiler mini-
mum heat output must be adjusted, must
not be lower than that stated in the tables
(Par. 3.18).
• Adjustment (any) of the boiler maximum heat
output in heating phase.
- To adjust the maximum heat output during
the heating phase, change parameter (5),
increasing the value the pressure increases,
reducing it the pressure drops.
- The pressure to which the boiler maximum
heat output must be adjusted in central heat-
ing phase, must not be carried out in refer-
ence to that stated in the tables (Par. 3.18).
3.9 AUTOMATIC SLOW IGNITION
FUNCTION WITH TIMED RAMP
DELIVERY.
In ignition phase, the P.C.B. supplies constant
gas with pressure proportional to the parameter
“G2” set.
3.10 CHIMNEY SWEEP” FUNCTION.
When activated, this function forces the boiler
to variable output for 15 minutes.
In this state all adjustments are excluded and only
the safety thermostat and the limit thermostat
remain active. To activate the chimney sweep
function, press the Reset button (1) for 8 seconds
in absence of DHW requests, its activation is sig-
nalled by the indication of the flow temperature
and the flashing
and
symbols.
This function allows the technician to check the
combustion parameters. Once the function is ac-
tivated, it is possible to select whether to perform
the check in CH status, regulating the parameters
with buttons (5 and 6) or in DHW mode opening
any DHW cock and always regulate the param-
eters with the buttons (5 and 6).
Functioning in CH or DHW mode is visualised
by the relative flashing
or
symbols.
On completion of the checks, deactivate the
function by pressing the Reset button (1) for
8 seconds.
3.11 PUMP ANTI-BLOCK FUNCTION.
The boiler has a function that starts the pump
once every 24 hours for the duration of 30
seconds in order to reduce the risk of the pump
becoming blocked due to prolonged inactivity.
3.12 THREE-WAY ANTI-BLOCK
FUNCTION.
The boiler is supplied with a function that
activates the motorises three-way unit every
24 hours, carrying out a complete cycle in order
to reduce the risk of three-way block due to
prolonged inactivity.
3.13 RADIATORS ANTI-FREEZE
FUNCTION.
If the system return water is below 4°C, the boiler
starts up until reaching 42°C.
3.14 P.C.B. PERIODICAL SELF-CHECK.
During functioning in central heating mode or
with boiler in stand-by, the function activates
every 18 hours after the last boiler check/power
supply. In case of functioning in domestic hot wa-
ter mode the self-check starts within 10 minutes
after the end of the withdrawing in progress, for
duration of approx. 10 seconds.
N.B.:
during self-check, the boiler remains off,
including signalling.
3.15 SOLAR PANELS COUPLING
FUNCTION.
The boiler is set-up to receive pre-heated water
from a system of solar panels up to a maximum
temperature of 65°C. In all cases, it is always
necessary to install a mixing vale on the hy-
draulic circuit upstream from the boiler on the
cold water inlet.
Note:
for good functioning of the boiler; the
temperature selected on the solar valve must
be 5 °C greater with respect to the temperature
selected on the boiler control panel.
For correct use of the boiler in this condition,
parameter P3 (DHW thermostat) must be set at
“1” and the parameter P9 (DHW ignition delay)
at a temperature sufficient to receive water from
a storage tank situated upstream from the boiler.
The greater the distance from the storage tank,
the longer the stand-by time to be set. When
these regulations have been performed, when
the boiler inlet water is at the same or greater
temperature with respect to that set by the DHW
selector switch, the boiler does not switch on.
Summary of Contents for MINI NIKE 24 3 E
Page 2: ......
Page 21: ...19 PL ES TR SI CZ HU RO IE RU UA SK Fig 3 5 4 4 5 6 6 d d c ...
Page 39: ...37 TR SI CZ HU RO IE RU UA SK ES PL Rys 3 5 4 4 5 6 6 d d c ...
Page 56: ...54 PL SI CZ HU RO IE RU UA SK ES TR Şek 3 5 4 4 5 6 6 d d c ...
Page 73: ...71 TR SI PL HU RO IE RU UA SK ES CZ Obr 3 5 4 4 5 6 6 d d c ...
Page 90: ...88 TR PL CZ HU RO IE RU UA SK ES SI Sl 3 5 4 4 5 6 6 d d c ...
Page 107: ...105 TR SI CZ PL RO IE RU UA SK ES HU 3 5 ábr 4 4 5 6 6 d d c ...
Page 124: ...122 TR SI CZ HU RO IE PL UA SK ES RU Илл 3 5 4 4 5 6 6 d d c ...
Page 141: ...139 TR SI CZ HU PL IE RU UA SK ES RO Fig 3 5 4 4 5 6 6 d d c ...
Page 160: ...158 TR SI CZ HU RO PL RU UA SK ES IE Fig 3 5 4 4 5 6 6 d d c ...
Page 177: ...175 TR SI CZ HU RO IE RU UA PL ES SK Obr 3 5 4 4 5 6 6 d d c ...
Page 194: ...192 TR SI CZ HU RO IE RU PL SK ES UA Мал 3 5 4 4 5 6 6 d d c ...
Page 197: ......