152
TR
SI
CZ
HU
RO
PL
RU
UA
SK
ES
IE
3
BOILER START-UP
(INITIAL CHECK).
To commission the boiler:
- ensure that the declaration of conformity of
installation is supplied with the appliance;
- make sure that the type of gas used corresponds
to boiler settings;
- check connection to a 230V-50Hz power
mains, correct L-N polarity and the earthing
connection;
- make sure the central heating system is filled
with water and that the manometer indicates
a pressure of 1÷1.2 bar.
- switch the boiler on and check correct ignition;
- make sure the gas maximum, intermediate
and minimum flow rate and pressure values
correspond to those given in the handbook,
Par. 3.18;
- check activation of the safety device in the
event of no gas, as well as the relative activation
time;
- check activation of the main switch located
upstream from the boiler;
- check the existing draught during normal
functioning of the appliance, e.g. a draught
gauge positioned at the exit of the appliance
combustion products;
- check that there is no backflow of combustion
products into the room, even during function-
ing of fans;
- ensure activation of all adjustment devices;
- seal the gas flow rate regulation devices (if set-
tings are modified);
- check the production of domestic hot water;
- check sealing efficiency of water circuits;
3.1 HYDRAULIC DIAGRAM.
Fig. 3-1
- check ventilation and/or aeration of the instal-
lation room where provided.
If any checks/inspection give negative results, do
not start the boiler.
Key:
1 - Domestic hot water flow switch
2 - System filling valve
3 - Flow limiter
4 - Domestic hot water probe
5 - Gas valve
6 - System expansion vessel
7 - Burner
8 - Primary heat exchanger
9 - Flue hood
10 - Flue safety thermostat
11 - Safety thermostat
12 - Delivery probe
13 - Vent valve
14 - Boiler pump
15 - System draining valve
16 - System pressure switch
17 - DHW. heat exchanger
18 - Three-way valve (motorised)
19 - By-pass
20 - 3 bar safety valve
G - Gas supply
AC - Domestic hot water outlet
AF - Domestic cold water inlet
R - System return
M - System flow
Summary of Contents for MINI NIKE 24 3 E
Page 2: ......
Page 21: ...19 PL ES TR SI CZ HU RO IE RU UA SK Fig 3 5 4 4 5 6 6 d d c ...
Page 39: ...37 TR SI CZ HU RO IE RU UA SK ES PL Rys 3 5 4 4 5 6 6 d d c ...
Page 56: ...54 PL SI CZ HU RO IE RU UA SK ES TR Şek 3 5 4 4 5 6 6 d d c ...
Page 73: ...71 TR SI PL HU RO IE RU UA SK ES CZ Obr 3 5 4 4 5 6 6 d d c ...
Page 90: ...88 TR PL CZ HU RO IE RU UA SK ES SI Sl 3 5 4 4 5 6 6 d d c ...
Page 107: ...105 TR SI CZ PL RO IE RU UA SK ES HU 3 5 ábr 4 4 5 6 6 d d c ...
Page 124: ...122 TR SI CZ HU RO IE PL UA SK ES RU Илл 3 5 4 4 5 6 6 d d c ...
Page 141: ...139 TR SI CZ HU PL IE RU UA SK ES RO Fig 3 5 4 4 5 6 6 d d c ...
Page 160: ...158 TR SI CZ HU RO PL RU UA SK ES IE Fig 3 5 4 4 5 6 6 d d c ...
Page 177: ...175 TR SI CZ HU RO IE RU UA PL ES SK Obr 3 5 4 4 5 6 6 d d c ...
Page 194: ...192 TR SI CZ HU RO IE RU PL SK ES UA Мал 3 5 4 4 5 6 6 d d c ...
Page 197: ......