51
51
de
fr
en
nl
Table of contents
Page
Scope of delivery
52
Basic equipment
52
Additional equipment
Operating
53
Function
• TecBox | Additional equipment
54 | 55
Set-up
• Wiring diagram | TecBox 3D drawing
56 – 59
BrainCube control
• Setting Function | Parameters |
menu
| Messages
Installation
60
TecBox
• Installation | Installation procedure | Example installation
61
Connecting pipes DN
• To TecBox | Standard values
62 | 63
Electrical connection
• Requirements | Power supply connections | RS 485-1 | ComCube |
Water make-up through RS 485-1
64
Terminal plan
• BrainCube
Start-up (IBN)
65
Requirements
• Consumer system ready!
65
BrainCube
• Switching on | Follow instructions on the BrainCube
65 | 66
Welcome - initial start-up
• Welcome - Set language, date, time
• Initial start-up as described in the instructions
• Select
standby
or
auto
• Set parameters on the BrainCube
67
BrainCube with ComCube DCD
• Follow the separate ComCube Installation | Operation instructions
67
BrainCube with ComCube DCA
• Sensors | Signals | Evaluation
• Follow the separate ComCube Installation | Operation instructions
67
Water make-up through RS 485-1
• Set parameters on the BrainCube of Transfero, Compresso
Operation
68
Basic principles
68
auto
• All functions activated | keep in auto mode all year round
68
standby
• Display active only |Carrying out maintenance
68
menu
• Functions selectable, testable and modifiable
68
check
• Maintenance and functional test:
Recommended once a year by IMI Hydronic Engineering’s Customer
Service
69
Messages
• View, acknowledge | Message list | Correcting technical faults
70
Inspection | Disassembly
• As required by regulations in the country concerned
• The system must be depressurised first!
71
Safety
Technical data
72
Terms | Media
72
Working pressure range
99
CE conformity
Summary of Contents for Pleno PI 6.1
Page 25: ...25 25 de fr en nl...
Page 49: ...49 49 de fr en nl...
Page 73: ...73 73 de fr en nl...
Page 97: ...97 97 de fr en nl...
Page 98: ...98...