Platinum™ Predator II-GX 2RU
Chapter 3
Installation and Operation Manual
User
Upgrade
© 2014 Imagine Communications.
Proprietary and Confidential.
Edition E | Page 36
As the upgrade progresses, Z_Upgrade will display a green progress bar.
The update component in process will be shown in the Status column and on the front panel of the
unit(s) being upgraded.
SW Upgrade
has started
CAUTION
On no account should the power be interrupted during the
upgrade.
When the upgrade process is finished, Z_Upgrade will display an
Upgrade Status
message showing
any errors.
11.
If necessary, double click on an entry row to see error details.
Z_Upgrade and the multiviewer front panel(s) should display a message asking for the unit(s) to be
power cycled.
Pls power cycle
this unit