![IKA HRC 2 control Operating Instructions Manual Download Page 9](http://html1.mh-extra.com/html/ika/hrc-2-control/hrc-2-control_operating-instructions-manual_624652009.webp)
9
Note:
Please note the permissible temperature range of
hoses� For hot fluids we recommend the
IKA
®
LT 5�20 hoses�
When the external system is not necessary, please seal
the pump connection IN and OUT with the existing union
nuts and stoppers�
When
IKA
®
calorimeter is not connected, please close
the “
Backflow
” connector with included backflow cap�
In case of closed external system, if there is in any case no
risk of exceeding the maximum fluid level, you can close
the “
Overflow
” connector with the included overflow
cap� This minimizes the energy loss and protects, in case
of long-term applications with low temperatures and
high humidity, against unwanted water input and the as-
sociated volume increase�
Check fluid heat expansion!
External
system
IKA
®
Calorimeter
Fig. 7
• Inserting battery into the WiCo:
Model: WiCo CBC
5
LPS
IP 40
Model: WiCo CBC
5
LPS
IP 40
Model: WiCo CBC
5
LPS
IP 40
Model: WiCo CBC
5
LPS
IP 40
Note:
notch upward!
• Mounting the WiCo to the station:
Note:
If the
WiCo
need be permanently attached to the
station
, we strictly recommend to fasten the unlocking
button with the integrated screw (turn counter clock wise)�
Model: WiCo CBC
5
LPS
IP 40
Fig. 8
IKA
®
HRC 2
control
High
Low
Fluid level
R 2
Fig. 9
• Filling and draining:
- Before filling the fluid into the bath, open the front
cover as indicated in following figure�
IKA
®
HRC 2
cont
rol
Fig. 10
- Check and make sure that the drain valve is closed (ro-
tate clockwise to the stop position, see Fig� 11)�
Note:
Please note information in section “Commissioning”�
- Connect the power plug and turn on the device with
power switch (12)�
- The low level icon ( ) appears on the display of the
WiCo
� Meanwhile, the bottom LED segment of fluid
level indicator lights up in red color to indicate the low
fluid level�
- Open the filling opening lid (4) and remove the stopper
from the filling opening� Then, fill fluid to the bath�
Note:
The stopper must be kept being plugged in dur-
ing during operation except for filling fluids�