
OPERATION
IC75 ENG
3-6
“BREAK-IN” OPERATION
IMPORTANT
If a new machine is used in severe conditions, its
performances are deteriorated early and the
service life becomes shorter. Break in a new
machine for about 100 hours first.
Pay attention to the following when breaking in a new
machine.
•
Warm up the machine sufficiently.
•
Do not apply heavy loads to the machine or run it at
high speed.
Run the machine at approximately 80% of the
maximum engine speed.
Place loads of approximately 80% of the maximum
loading capacity.
•
Do not start or accelerate quickly or stop unnecessarily.
Do not change the direction quickly.
Warm-up operation
Summary of Contents for IC75
Page 1: ...OPERATION MANUAL IC75 SERIAL NUMBER CA003001 PUB 1 1007...
Page 2: ......
Page 6: ...IC75 ENG...
Page 10: ...IC75 ENG...
Page 26: ...SAFETY IC75 ENG 1 16 This page is intentionally left blank...
Page 28: ...IC75 ENG...
Page 42: ...IC75 ENG...
Page 62: ...OPERATION IC75 ENG 3 20 This page is intentionally left blank...
Page 64: ...IC75 ENG...
Page 96: ...MAINTENANCE IC75 ENG 4 32 Electrical wiring system diagram INSTRUMENT PANEL...
Page 102: ...MAINTENANCE IC75 ENG 4 38 This page is intentionally left blank...
Page 103: ...IC75 ENG SPECIFICATIONS...
Page 104: ...IC75 ENG...