
IC75 ENG
0
CONTENTS
FOREWORD
······························································································································· 0-1
SAFETY INFORMATION
············································································································ 0-2
SAFETY
PRECAUTIONS BEFORE OPERATION·············································································· 1-1
PRECAUTIONS DURING OPERATION ·············································································· 1-3
PRECAUTIONS AFTER OPERATION················································································· 1-6
PRECAUTIONS AT TRANSPORTING················································································· 1-7
PRECAUTIONS AT MAINTENANCE ··················································································· 1-7
WARNING SIGNS AND LABELS ······················································································· 1-11
CONTROLS
NOMENCLATURE ··············································································································· 2-1
CONTROLS AND INSTRUMENTS ······················································································ 2-2
Monitor panel
Meters
Switches
Safety warning devices
Control levers
CABIN································································································································· 2-10
Cabin
Operator seat
Seat belt
Air conditioner
OPERATION
BEFORE STARTING OPERATION······················································································ 3-1
BEFORE STARTING THE ENGINE····················································································· 3-2
ENGINE STARTING············································································································· 3-3
AFTER STARTING THE ENGINE························································································ 3-3
WARMING UP THE MACHINE ···························································································· 3-4
STARTING WITH JUMPER CABLES ·················································································· 3-5
“BREAK-IN” OPERATION ···································································································· 3-6
TRAVELING THE MACHINE································································································ 3-7
Start-travel-stop
Steering control
Caution of travel on a steep grade
DUMP OPERATION··········································································································· 3-11
Procedure of dump operation
Caution of dump operation
Summary of Contents for IC75
Page 1: ...OPERATION MANUAL IC75 SERIAL NUMBER CA003001 PUB 1 1007...
Page 2: ......
Page 6: ...IC75 ENG...
Page 10: ...IC75 ENG...
Page 26: ...SAFETY IC75 ENG 1 16 This page is intentionally left blank...
Page 28: ...IC75 ENG...
Page 42: ...IC75 ENG...
Page 62: ...OPERATION IC75 ENG 3 20 This page is intentionally left blank...
Page 64: ...IC75 ENG...
Page 96: ...MAINTENANCE IC75 ENG 4 32 Electrical wiring system diagram INSTRUMENT PANEL...
Page 102: ...MAINTENANCE IC75 ENG 4 38 This page is intentionally left blank...
Page 103: ...IC75 ENG SPECIFICATIONS...
Page 104: ...IC75 ENG...