57
ifm
Device Manual AS-i IO-Link-Gateway (AC5225) Firmware V1.16
2017-11-20
Glossary of Terms
>
PCD
PCD =
P
rojected
C
onfiguration
D
ata
Configuration data stored in the device:
→ LPS and AS-i profile (IO, ID, ID1, ID2)
>
PDM
PDM =
P
rocess and
D
ialogue
M
odule.
Device for communication of the operator with the machine / plant.
>
PELV
PELV =
P
rotective
E
xtra
L
ow
V
oltage
Functional extra low voltage with safe separation, grounded variant of
→SELV. The specification as
PELV system to IEC 364-4-41 covers a measure to protect against direct and indirect contact with
dangerous voltages by a "safe separation" between primary and secondary side in the device (e.g.
power supply to PELV specification).
For this reason no separate PE conductor is required in a PELV system. It is allowed to ground circuits
and / or bodies in a PELV system.
>
Pictogram
Pictograms are figurative symbols which convey information by a simplified graphic representation.
(
→ chapter
What do the symbols and formats mean?
(
>
PLC configuration
Part of the CODESYS user interface.
► The programmer tells the programming system which hardware is to be programmed.
>
CODESYS loads the corresponding libraries.
>
Reading and writing the periphery states (inputs/outputs) is possible.
>
Polling
to poll = to count votes
The controller master fetches the data from every participant in the system successively:
1. Master calls participant 1.
2. Participant 1 replies with its current data (actual values).
3. Master transfers more data (target values) to participant 1, if needed.
4. Participant 1 acknowledges reception of the data.
etc. the same procedure for each further participant.
AS-i,
→cyclical polling: AS-i master cyclically polls the data of all →slaves in the →bus (see above).
The data is updated in the
→master after max. 5 ms. If →A/B slaves are used, the →cycle time can be
extended to 10 ms.
>
Power-on delay time
The time required by the controller K6 from the application of the voltage supply until all of the
following targets are reached:
both AS-i networks have reached normal operation
the master has read the configuration data of the CTTx slaves
the field buses can use the gateway (optional)
the PLC program was started (optional).
Summary of Contents for AC5225