PREPARING SILO FOR TRANSPORT
1.
Most important is to be positive that all cement has been removed from silo, auger
and bag-house.
2.
Using a rubber mallet, hit the sidewalls of hopper section of silo; listening for a
hollow sound. Clean out remaining cement. A bag of floor dry will aid in cleaning
out the auger by opening the manhole on top of the silo, pour the floor dry inside of
the cement silo. Turn auger on, open discharge gate. Run auger until the floor dry
no longer comes out of discharge end of auger. Turn auger off and close discharge
gate.
3.
Disconnect air supply.
4.
Disconnect electrical supply. CAUTION! Only a qualified person should do this.
5.
Using side-wind tongue jack, raise front of cement silo until all weight is off both
front legs...
6.
Remove keepers from both front leg pins, slowly remover leg pins. CAUTION! Inner
leg will fall to ground. STAY CLEAR WHEN REMOVING LEG PINS.
7.
Using handle on leg pad, raise leg until pin can be installed in first hole. Install leg
pin through hole, install keeper. Repeat on second leg at front of cement silo.
8.
Using side-wind tongue jack, lower front of cement silo until all weight is on both
rear legs.
9.
Remove keepers from both leg pins; slowly remove leg pins. CAUTION! Inner leg
will fall to ground. STAY CLEAR WHEN REMOVING LEG PINS!
10.
Using handle on leg pad, raise leg until leg pin can be installed in first hole. Install
leg pin through hole and install keeper. Repeat on second leg at rear of cement silo.
11.
Using side-wind tongue jack, raise front of cement silo until tow vehicle can back
under pintle hitch.
12.
Back tow vehicle under pintle hitch, using top-wind tongue jack, lower front of
cement silo onto tow vehicle hitch, secure latch. Hook safety chains and break-away
cable to tow vehicle. Plug in lights, check lights for proper operation.
13.
Raise top-wind jack to full up position. See drawing (Adjustable Legs) on page 23.
14.
Clean all debris of silo before towing.
Summary of Contents for FAST-WAY Si-Low 210 A1
Page 3: ...1 1 2 2 3 3 4 4 A A B B C C D D Si Low 210 A1 1...
Page 4: ...IDEAL MANUFACTURING INC 440 460 VOLT THREE PHASE...
Page 5: ...IDEAL MANUFACTURING INC 240 VOLT THREE PHASE...
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......