50
Operation & Maintenance Manual
Cyclo® BBB4
Cyclo® BBB4
Screw Conveyor Options
Components, Assembly Instructions
Figure 37. Cyclo® BBB4 Screw Conveyor Components
Screw Conveyor Assembly Instructions
Table 46. Typical Cyclo® BBB4 Screw
Conveyor Components
Item Number
Description
1
Screw Conveyor Shaft for KHB
2
Screw Conveyor Shaft for TGB
3
Cast Screw Conveyor Adapter
4
Shaft Seal
5
Shaft Retaining Plate
6
Fabricated Screw Conveyor Adaptor
7
Optional Braided Cord Packing Seal
8
Optional Gland Cover Plate
1
Insert the
screw conveyor shaft
completely into the Cyclo® BBB4
output hub
.
Tapered Grip Bushing Type
– Screw the threaded end into the BBB unit.
Keyed Type
– Apply anti-seize paste to the driven shaft, install key into shaft
keyway, align the key and hollow shaft keyway and carefully slide the shaft into
the BBB unit
Keyed Type
Screw Conveyor Components
Tapered Grip Bushing Type
-
Summary of Contents for FAST-WAY Si-Low 210 A1
Page 3: ...1 1 2 2 3 3 4 4 A A B B C C D D Si Low 210 A1 1...
Page 4: ...IDEAL MANUFACTURING INC 440 460 VOLT THREE PHASE...
Page 5: ...IDEAL MANUFACTURING INC 240 VOLT THREE PHASE...
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......