
31
Minimiser
-
Installation
56 RE-ASSEMBLY
57 BURNER PRESSURE CHECK
SERVICING
58 GENERAL
SER
VICING
Reassemble the boiler in the following order:
1.
Refit the burner, renewing any damaged or
deteriorating sealing gaskets.
2.
Reconnect the 2 ignition leads and the detection lead.
3.
Reconnect the pressure sensing pipe to the burner.
4.
Refit the fan, engaging it in the bayonet fixing and
locating it in the retaining bracket.
Ensure that the O ring seal is in place.
5.
Reconnect the pressure sensing pipe to the fan and
Note.
The fan and burner pressure sensing pipes must be tested for gas soundness
1.
Isolate the electricity supply
2.
Turn off the gas supply.
3.
Remove the boiler front panel and sealing panel - refer to Frames 12 and 52.
IMPORTANT.
When work is complete the sealing panel must be correctly fitted, ensuring that a good seal is made.
Note.
In order to assist fault finding, the control box printed circuit board is fitted with three indicator lights which represent the
following boiler conditions - refer to Frame 72.
LED 2
Lockout
LED 3
Fan on
LED 4
Mains electricity on
THE BOILER MUST NOT BE OPERATED IF THE SEALING PANEL IS NOT FITTED.
WHEN REPLACING ANY
COMPONENT
After any servicing, reference should be made to Table 2, page 3 (or the data plate), which quote details
of the burner pressures for the boiler models.
The burner pressure should be checked against these values and adjusted accordingly - refer to 'Initial
Lighting', Frame 47.
If the burner pressure is very low check the fan pressure - refer to Fault Finding Frame 82.
REPLACEMENT OF COMPONENTS
secure both pipes to the manifold block with the
clamping plate.
6.
Reconnect the fan electrical leads.
7.
Refit the boiler sealing panel.
IMPORTANT.
Ensure the boiler sealing panel is
correctly fitted and that a good seal is made.
8.
Refit the boiler front panel.
9.
Turn on the gas supply at the gas service cock.
10.
Reconnect the electrical supply.