15
INSTALLATION
isar + programmer -
Installation and Servicing
1.
Ensure the boiler is on a sound flat
surface.
2.
Carefully remove the strapping.
3.
Fold back the top flaps to gain access to:
z
Instructions.
z
Wall mounting template.
z
1 year guarantee.
z
Pre-piping frame.
4.
Remove the instructions and read
thoroughly before unpacking the product.
5.
When ready for installation lift off the
cardboard carton.
10 PACKAGING REMOVAL
11 BOTTOM AND FRONT PANEL REMOVAL
1.
Remove the screws from the
underside of the boiler.
2.
Pull the RHS of the panel
down, slide it to the right and
withdraw.
3.
Remove the screws from
bottom of the front panel.
4.
Lift panel up and off top
pegs.
Boiler
Hardware
pac
k
box
Pre-piping
frame
nm842
5
Retaining
clip
2
1
3
tim
e
P R
O G
R A
M
M
E R
prog
select
+
-
INST
ALLA
TION
202851-1new.pmd
17/11/2006, 07:40
15