17
INSTALLATION
isar + programmer -
Installation and Servicing
FLUE OUTLET
Note.
The template shows the positions of the fixing holes and
the flue hole centres for standard installation and for using
the stand-off kit. Care MUST be taken to ensue the correct
holes are drilled.
1.
Separate the templates.
2.
Tape template
A
into the selected position.
3.
Ensure squareness by hanging a plumbline as shown. If
fitting a side flue extend the flue centre line onto the side
wall and tape template
B
into the selected position.
4.
Mark onto the wall the following:
a
The piping frame screw positions (choose one from
each group).
b.
The position of the flue duct hole (see diagram below
and template).
Note.
Mark the centre of the hole as well as the
circumference
5.
Remove the template from the wall.
14 WALL MOUNTING TEMPLATE
13 FLUE ASSEMBLY - Exploded View
An optional flue duct extension kit is required for
wall thicknesses greater than :
Side
455mm (18").
Rear
490mm (19
1/4
").
Rear flue arrangement shown
Ecl 2360
V
A
B
Extended centre line
LEGEND
1.
Duct assembly.
2.
Flue turret.
3.
Turret gasket.
4.
M5 x 10 pozi screw.
5.
Turret clamp.
202851-1new.pmd
17/11/2006, 07:40
17