61
isar + programmer -
Installation and Servicing
INSTALLER NOTIFICATION GUIDELINES
IT IS A REQUIREMENT OF CORGI MEMBERSHIP TO REGISTER EVERY GAS APPLIANCE
In addition a change to Building Regulations
(
England and Wales
)
requires the installer to notify
when installing a heating appliance, as from 1st April 2
005
.
Competent Person's
SELF CERTIFICATION SCHE
M
E
BUILDING CONTROL
Install and commission
this appliance to
manufacturers' instructions
Complete the
Benchmar
k
Chec
k
list
Choose
Buildings Regulations
notification route
Contact your relevant
Local Authority
Building Control
(
LABC
)
who
will arrange an inspection
or contact a government
approved inspector
LABC will record the data
and will issue a
certificate of compliance
If you notify via CORGI Scheme,
CORGI will then notify the
relevant Local Authority Building
Control
(
LABC
)
scheme
on members behalf
Scheme members only:
Call CORGI on
0
87
0
88 88 777
or log onto:
www.corgi-notify.com
within 1
0
days
You must ensure that the
notification number
issued by CORGI is written
onto the Benchmar
k
Chec
k
list
CORGI will record the data and
will send a certificate of
compliance to the property
IT IS A CONDITION OF THE
MANUFACTURERS WARRANTY
THAT THE BENCHMARK
COMMISSIONING CHECKLIST IS
FULLY COMPLETED AND LEFT
WITH THE APPLIANCE
202851-1new.pmd
17/11/2006, 07:41
61