5
isar + programmer -
Installation and Servicing
GENERAL
Boiler size
G.C. Appliance No.
PI No.
(Benchmark No.)
HE24+P
47 348 43
0063 BO 3317
HE30+P
47 348 44
0063 BO 3317
HE35+P
47 348 45
0063 BO 3317
CONTENTS
Air Supply
.......................................................................
8
Benchmark Commissioning Checklist
.....................
62
Boiler Clearances
.........................................................
9
Boiler Exploded Diagram
............................................
13
Condensate Drain
...........................................
10, 21-22
Electrical Connections
...............................................
27
Electrical Supply
.........................................................
10
Extension Ducts - Fitting
.............................................
19
Fault Finding
...........................................................
52-56
Flow Wiring Diagram
..................................................
30
Flue Fitting
....................................................................
18
Flue Installation
.............................................................
8
Gas Safety Regulations
................................................
7
Gas Supply
.....................................................................
8
Installation
.............................................................
12-33
Mandatory Requirements
.......................................
7-10
Pump
..........................................................................
49
Safe Handling
................................................................
6
Servicing
................................................................
34-38
Short List of Parts
.......................................................
57
Thermostatic Radiator Valves
...................................
10
Water and Systems
...........................................
8,10-12
Water Connections
...............................................
24-25
Water Treatment
.........................................................
12
Wiring Diagrams
...................................................
27-30
isar HE +P
Natural Gas only
Destination Country:
GB, IE
time
P R
O G
R A
M
M
E R
prog
prog
selec
t
selec
t
+
-
B
oiler
Page
Make and model ....................................................... 5
Appliance serial no. on data badge ...................... 13
SEDBUK No. % ......................................................... 4
Controls
Time and temperature control to heating ............. 28
Time and temperature control to hot water .......... 28
Heating zone valves .............................................. n/a
TRV's ...................................................................... 10
Auto bypass ........................................................... 10
Boiler interlock ....................................................... 10
For all boilers
Flushing to BS.7593 .............................................. 12
Inhibitor .................................................................. 12
Central heating mode
Heat input ................................................to be calculated
For assistance see Technical Helpline on the back page
Page
Burner operating pressure .................................... n/a
Central heating flow temp. ...... measure and record
Central heating return temp. ... measure and record
For combination boilers only
Scale reducer ......................................................... n/a
Hot water mode
Heat input .......................................... to be calculated
Max. operating burner pressure .............................. n/a
Max. operating water pressure ........... measure & record
Cold water inlet temp ..................... measure & record
Hot water outlet temp. .................... measure & record
Water flow rate at max. setting ............ measure & record
For condensing boilers only
Condensate drain .................................................. 21
For all boilers:
complete, sign & hand over to customer
For GB, to comply with Building Regulations Part L1 (Section 6 in Scotland) the boiler should be fitted in accordance with the
manufacturer's instructions. Self-certification that the boiler has been installed to comply with Building Regulations can be
demonstrated by completing and signing the Benchmark Commissioning Checklist.
BENCHMARK COMMISSIONING CHECKLIST DETAILS
NOTE TO THE INSTALLER: COMPLETE
THE BENCHMARK COMMISSIONING
CHECKLIST AND LEAVE THESE
INSTRUCTIONS WITH APPLIANCE
202851-1new.pmd
17/11/2006, 07:40
5