Installation
23
SYSTEM CLEANING
All system pipes, especially those already installed, must be carefully cleaned and/or washed, to eliminate processing residues and
any sludge. The gaskets interposed in the joints must not reduce the pipe section.
HYDRAULIC CONNECTIONS
Once positioned, the superheated water boiler bodies must be connected to the system at the following points:
–
Fuels;
Connection to burner provided for methane gas, lpg, diesel and naphtha.
–
Compressed air;
The air pressure must be between 4 and 10 bar.
m
IMPORTANT
We recommend insulating the system pipes to avoid heat dispersion and greater fuel consumption.
Make sure that the drains of the generator safety valves have been connected to a drain well in order to avoid that, in
case of intervention, the rooms are flooded.
Make sure that the water and heating system pipes are not used as earthing point of the electrical system.
The air must be filtered with a 25 μm mesh.
m
IMPORTANT
ICI CALDAIE S.p.A.
is not liable for any harm to people, animals or property damage caused by errors in the choice of
components or in the construction of the plant.
FLUE EXHAUST
The main chimney features, such as height, section, type of outlet in the atmosphere, control points, smoke mass, must be
established by a company specialised in the sector that will operate according to the applicable Standards and Legislation. The
connection between chimney and generator (smoke duct) must be made according to the specific plant requirements.
m
IMPORTANT
The diameter of the connection between chimney and generator (smoke duct) must not be less than that shown in
the "DIMENSIONS AND CONNECTIONS" table (ØC value).