To fully set up and test the appliance in your network, use the following high-level
processes:
1.
Install the appliance in a rack:
a.
Install the rails in the rack.
b.
Secure the appliance in the rack.
c.
Connect the appliance to an AC source.
d.
Connect the appliance to the network.
2.
Set up the initial firmware configuration:
a.
Connect the USB serial cable to the serial port.
b.
Initialize the appliance.
c.
Verify the initial firmware configuration from the WebGUI.
3.
Define the base configuration.
Note:
If the intrusion switch was tripped during installation, clear the
intrusion-detection (see “Consideration for the intrusion switch” on page
25).
Chapter 2. Preparing for installation
15
Summary of Contents for WebSphere DataPower 7198
Page 1: ...WebSphere DataPower Type 7198 and 7199 Third Edition Installation and User s Guide...
Page 2: ......
Page 3: ...WebSphere DataPower Type 7198 and 7199 Third Edition Installation and User s Guide...
Page 16: ...xiv Installation and User s Guide...
Page 20: ...xviii Installation and User s Guide...
Page 36: ...16 Installation and User s Guide...
Page 50: ...30 Installation and User s Guide...
Page 87: ......
Page 88: ...Part Number 97Y0541 Printed in USA 1P P N 97Y0541...