1
Screws
2
Electronics
assembly
5.
Stand
at
the
front
of
the
rack.
With
the
help
of
another
service
representative,
place
the
back
of
the
UPS
5125
onto
the
support
rails
and
then
slide
it
into
the
rack.
6.
Install
the
front
flathead
screws
1
.
See
1
2
Figure
18.
Removing
the
uninterruptible
power
supply
electronics
assembly
44
IBM
TotalStorage
SAN
Volume
Controller:
Installation
Guide
Summary of Contents for TotalStorage SAN Volume Controller
Page 1: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 2 1 0 SC26 7541 04...
Page 2: ......
Page 3: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 2 1 0 SC26 7541 04...
Page 8: ...vi IBM TotalStorage SAN Volume Controller Installation Guide...
Page 10: ...viii IBM TotalStorage SAN Volume Controller Installation Guide...
Page 11: ...Tables 1 Uninterruptible power supply support guidelines 17 Copyright IBM Corp 2003 2005 ix...
Page 12: ...x IBM TotalStorage SAN Volume Controller Installation Guide...
Page 30: ...xxviii IBM TotalStorage SAN Volume Controller Installation Guide...
Page 44: ...14 IBM TotalStorage SAN Volume Controller Installation Guide...
Page 62: ...32 IBM TotalStorage SAN Volume Controller Installation Guide...
Page 102: ...72 IBM TotalStorage SAN Volume Controller Installation Guide...
Page 108: ...78 IBM TotalStorage SAN Volume Controller Installation Guide...
Page 114: ...84 IBM TotalStorage SAN Volume Controller Installation Guide...
Page 121: ......
Page 122: ...Part Number 64P8289 Printed in USA SC26 7541 04 1P P N 64P8289...
Page 123: ...Spine information IBM TotalStorage SAN Volume Controller Installation Guide Version 2 1 0...