![IBM ThinkPad R30 Operator'S Manual Download Page 260](http://html1.mh-extra.com/html/ibm/thinkpad-r30/thinkpad-r30_operators-manual_3340620260.webp)
E-12
Operator Guide
Diagnostic Load Progress Indicators
The following dump progress indicators, or dump status codes, are part of a Type 102
message.
Note: When a lowercase
c
is listed, it displays in the lower half of the seven-segment
character position. The leftmost position is blank on the following codes.
0c0
The dump completed successfully.
0c2
A dump, requested by the user, is started.
0c3
The dump is inhibited.
0c4
The dump did not complete. A partial dump may be present.
0c5
The dump program could not access the dump device.
0c6
A dump to the secondary dump device was requested. Make the secondary
dump device ready; then press Ctrl-Alt-Numpad2.
0c7
Reserved.
0c8
The dump function is disabled.
0c9
A dump is in progress.
Summary of Contents for ThinkPad R30
Page 1: ...7015 Models R30 R40 and R50 CPU Enclosure Operator Guide...
Page 12: ...xii Operator Guide...
Page 16: ...xvi Operator Guide...
Page 20: ...1 4 Operator Guide...
Page 132: ...4 10 Operator Guide AC Rack Cables and the CPU Enclosure Connectors CPU Enclosure...
Page 156: ...6 4...
Page 194: ...10 4 Operator Guide...
Page 238: ...B 8 Operator Guide...
Page 248: ...D 4 Operator Guide...