![IBM ThinkPad R30 Operator'S Manual Download Page 145](http://html1.mh-extra.com/html/ibm/thinkpad-r30/thinkpad-r30_operators-manual_3340620145.webp)
Using the AC Rack
5-3
Manually Powering On the AC Rack Containing a PDU
1. Set the key mode switch to the Service position.
Key Mode Switch
Normal
Secure
Service
Operator Panel
Note: For a translation of this notice, see the
System Unit Safety Information manual.
CAUTION:
This product is equipped with a 3-wire power cable and plug for the user’s safety. Use
this power cable in conjunction with a properly grounded electrical outlet to avoid
electrical shock.
Note: Ensure that the power button is in the off position (button in the out position) before
plugging the CPU enclosure power cord into the power distribution system on your
rack.
2. Plug the system unit power cord into the electrical outlet.
3. If the battery backup unit is installed, set the Master CB2 circuit breaker to On.
Note: Ensure that the key mode switch is set to the Service position to prevent system unit
power from being switched on unexpectedly.
4. Set the Master CB1 circuit breaker to On.
Battery Backup Unit
Power Distribution Unit
Master CB2
Master CB1
Summary of Contents for ThinkPad R30
Page 1: ...7015 Models R30 R40 and R50 CPU Enclosure Operator Guide...
Page 12: ...xii Operator Guide...
Page 16: ...xvi Operator Guide...
Page 20: ...1 4 Operator Guide...
Page 132: ...4 10 Operator Guide AC Rack Cables and the CPU Enclosure Connectors CPU Enclosure...
Page 156: ...6 4...
Page 194: ...10 4 Operator Guide...
Page 238: ...B 8 Operator Guide...
Page 248: ...D 4 Operator Guide...