2
Latch-lock
3
Back rail bracket
6.
Place the front end of the left rail in the rack cabinet. Align the top of the
front bracket
1
(Figure 42) with the required EIA marking that is on the
rack.
1
Front bracket
2
Rack-mounting flange
3
Locating pins
7.
Align the locating pins
3
with the holes that are in the rack-mounting
flange.
8.
Push the latch lock
2
(Figure 43 on page 46) away from the rail to release
the carrier. The latch-lock carrier slides toward the front of the rack and the
locating pins project through the holes that are in the front flange and in the
front rail bracket.
Important:
Ensure that the locating pins are fully extended through the front
rail bracket.
1
2
3
Figure 42. Installing the front end of the rail
Chapter 4. Installing the SAN Volume Controller 2145-8F4 or the SAN Volume Controller 2145-8F2 hardware
45