2
Wing nut
5.
Select the holes in the rail where you want to position the 2145 UPS-1U.
Note:
The bottom flange of the support rail must align with the EIA mark on
the rack.
6.
Using two M6
×
10 screws (
1
in Figure 29) and two clip nuts
2
, attach the
rail to the rear of the rack. The customer’s rack might be different than the one
shown here, and if so, might require different clip nuts or fasteners.
7.
Install two clip nuts (
2
and
3
in Figure 30) to the front of the rack and then
attach the rail using just one M6 x 10 screw in the bottom mounting hole
1
.
8.
Repeat steps 6 and 7 for the other rail.
9.
Tighten the assembly wing nuts on both rail assemblies.
Installing the 2145 UPS-1U in the rack
After you have completed the preparation procedures, you are ready to install the
2145 UPS-1U in the rack.
1
2
svc00034
Figure 29. Securing the rear rail on the 2145 UPS-1U
Figure 30. Securing the front rail on the 2145 UPS-1U
Chapter 4. Installing the SAN Volume Controller 2145-8F4 or the SAN Volume Controller 2145-8F2 hardware
37
1
1