Figure 89. Lowering the BPM into the drive tray
f) Refer to Figure 90 on page 90. Rotate the BPM on its longer axis to expose the cable connectors
at the bottom of the BPM.
g) Using your cable labels, connect both BPM cables to the BPM as shown in the following image.
The cables are routed through the cutout in the BPM. Push the BPM cables in until the connector
latches click.
Removing and replacing the system backplane in the 5105-22E, 9008-22L, 9009-22A, 9009-22G, 9223-22H,
or 9223-22S 89
Summary of Contents for Power Systems 9223-22S
Page 4: ...iv...
Page 14: ...xiv Power Systems System backplane...
Page 18: ...or or or or 4 Power Systems System backplane...
Page 138: ...124 Power Systems System backplane...
Page 149: ......
Page 150: ...IBM...