14. Lift the processor housing
.2/
out of the server and put it aside. This processor housing is not used
with the upgrade.
Note: Keep the processor housing nearby and in a safe place for use in troubleshooting the upgrade,
if troubleshooting becomes necessary.
15. Note the location of all cables connected to the shuttle and disconnect the cables.
16. Remove the shuttle from the server and place it on a flat, static-free surface.
17. Go to “Replacing the diagnostic panel and front panel assemblies” on page 8.
Upgrade installation
7
Summary of Contents for Netfinity 1000
Page 1: ...IBM Netfinity Four Way Processor Upgrade Kit Installation Instructions...
Page 2: ......
Page 3: ...IBM Netfinity Four Way Processor Upgrade Kit Installation Instructions...
Page 8: ...vi Processor Upgrade Instructions...
Page 43: ......
Page 44: ...IBM Part Number 01K7672 Printed in U S A 1K7672...