1
Power supply
2
Cam handle release latch
3
Power and Fault LEDs
4
Cam handle
5
Power cord locking mechanism
Note:
If you are having difficulty unplugging the power supply, remove the
cable management arm from the controller module.
a.
Pinch the tab on the locking mechanism of the cable retainer clip, and then
open the retainer clip.
b.
Slide the retainer clip off the cord.
c.
Unplug the power cord from the power source, and then remove the power
cord from the power supply.
4.
Press down the release latch on the power supply cam handle, lower the cam
handle to the fully open position, and then slide the power supply out of the
chassis. Make sure that you support the power supply with your free hand.
Installing a power supply
To install a power supply, you must place the power supply in the chassis, secure
it, and reconnect the power cord to the power source.
Procedure
1.
Make sure that the on/off switch of the new power supply is in the Off
position.
2.
If you are not already grounded, properly ground yourself.
1
2
5
3
4
Figure 16. Removing the power supply
Replacing N6200 series system devices
29
Summary of Contents for N6270
Page 12: ...xii IBM System Storage N6200 Series Hardware and Service Guide...
Page 16: ...xvi IBM System Storage N6200 Series Hardware and Service Guide...
Page 18: ...xviii IBM System Storage N6200 Series Hardware and Service Guide...
Page 20: ...xx IBM System Storage N6200 Series Hardware and Service Guide...
Page 46: ...20 IBM System Storage N6200 Series Hardware and Service Guide...
Page 130: ...104 IBM System Storage N6200 Series Hardware and Service Guide...
Page 134: ...108 IBM System Storage N6200 Series Hardware and Service Guide...
Page 146: ...120 IBM System Storage N6200 Series Hardware and Service Guide...
Page 147: ......
Page 148: ...Printed in USA GA32 0838 04...