Figure 35. Replacing right ear cap
5. Push the enclosure into the rack while pulling the outer rail until the outer and the inner rails lock into
the serviceable position. This is accompanied by an audible click.
6. Press the release tab and push the enclosure fully into the rack.
Release Tab
Figure 36. Release tab
7. Secure the enclosure on the left and right front of the enclosure to the left and right front rack posts by
using the two M5 X 9 shipping screws as shown in the following figure.
Figure 37. Securing the enclosure
At this point, the rails and IBM Elastic Storage System 3200 enclosure are installed. The enclosure is
mounted on the rail with all the components that were removed, reinserted into the slots.
Chapter 4. Installing 55
Summary of Contents for Elastic Storage System 3200
Page 6: ...vi ...
Page 11: ...99 Adapter slot to access server via Ethernet 121 xi ...
Page 12: ...xii ...
Page 18: ...xviii IBM Elastic Storage System 3200 Hardware Planning and Installation Guide ...
Page 42: ...24 IBM Elastic Storage System 3200 Hardware Planning and Installation Guide ...
Page 100: ...82 IBM Elastic Storage System 3200 Hardware Planning and Installation Guide ...
Page 108: ...90 IBM Elastic Storage System 3200 Hardware Planning and Installation Guide ...
Page 132: ...114 IBM Elastic Storage System 3200 Hardware Planning and Installation Guide ...
Page 136: ...118 IBM Elastic Storage System 3200 Hardware Planning and Installation Guide ...
Page 140: ...122 IBM Elastic Storage System 3200 Hardware Planning and Installation Guide ...
Page 142: ...124 IBM Elastic Storage System 3200 Hardware Planning and Installation Guide ...
Page 150: ...132 IBM Elastic Storage System 3200 Hardware Planning and Installation Guide ...
Page 155: ......
Page 156: ...IBM Product Number 5765 DME 5765 DAE SC31 5733 00 ...