![background image](http://html2.mh-extra.com/html/ibm/cloud-object-storage-system-slicestor-2212/cloud-object-storage-system-slicestor-2212_service-and-maintenance-manual_3358287164.webp)
The possible IMAGE and CONFIG status:
ACTIVE
This file is currently loaded in active memory and is running on the IBM 2212.
Note: The status of this file can be changed only by resetting the IBM 2212.
If a config or an image is active, it is locked and cannot be overwritten
or erased.
AVAIL
This is a valid file that can be made active.
CORRUPT
This file was damaged or was not loaded onto the IBM 2212 hard drive or
compact disk completely.
PENDING
This file will be loaded and become active the next time the IBM 2212 is
reloaded.
LOCAL
This file will become active at the next reset. This reset will cause the currently
ACTIVE file to become PENDING. LOCAL is a status that makes a file ACTIVE
only for one reset of the IBM 2212.
Only one bank at a time contains an ACTIVE image. Only one configuration file is ACTIVE and
it must be within the ACTIVE bank.
To use the Service Recovery Interface (
SVC>
), to view the operational software and
configuration files, follow these steps:
1. Access the
SVC>
prompt as described on page “Accessing the Service Recovery Prompt
(SVC>)” on page E-4.
2. Type list. See step 3 on page E-25 in the previous section for an explanation of the
information displayed on the terminal. You can also type describe at the
SVC>
prompt and
press Enter to identify the levels of code on your IBM 2212.
Resetting the IBM 2212
Question How do I reset the operational software on the IBM 2212?
Answer
The IBM 2212 operational software can be reset in the following ways:
¹
Unplug and replug the IBM 2212 power cord.
¹
Press and
hold for 6 seconds the reset button on the system card. The IBM 2212 will
behave as if it has been powered off and back on: component tests are run and the
operational code is reloaded.
Note: If you press the reset button and
hold it for less than 6 seconds, the memory
contents will be dumped if dumping has been enabled via talk 6 in the
command-line interface. It will also reboot the IBM 2212 if reboot has been enabled
via talk 6 in the command-line interface. If reboot has
not been enabled, the IBM
2212 will hang until it has been powered off and on. It is recommended that reboot
always be enabled on the IBM 2212.
¹
Both the OPCON (
*
) prompt and
Config only>
prompt support the reload and restart
commands. From either prompt, type reload or restart and press Enter.
The reload command causes the IBM 2212 to behave as if it has been powered off and
back on: system card and hard drive or compact flash component tests are run and the
operational code is reloaded.
The restart command activates configuration changes, operational code is not reloaded
and diagnostic tests are not run. You cannot use restart to initialize a new version of the
operational code.
E-26
2212 Service and Maintenance
Summary of Contents for Cloud Object Storage System Slicestor 2212...
Page 1: ...2212 Access Utility Service and Maintenance Manual GY27 0362 02...
Page 8: ...viii 2212 Service and Maintenance...
Page 28: ...1 20 2212 Service and Maintenance...
Page 86: ...3 8 2212 Service and Maintenance...
Page 98: ...5 4 2212 Service and Maintenance...
Page 110: ...Testing the Adapters 6 12 2212 Service and Maintenance...
Page 112: ...Assembly 1 Final Assembly IBM 2212 Models 10x A 2 2212 Service and Maintenance...
Page 114: ...Assembly 2 Final Assembly IBM 2212 Models 15x A 4 2212 Service and Maintenance...
Page 116: ...Assembly 3 Final Assembly IBM 2212 Models 1xx A 6 2212 Service and Maintenance...
Page 118: ...Assembly 4 Final Assembly IBM 2212 Models 1xx A 8 2212 Service and Maintenance...
Page 120: ...Assembly 5 Final Assembly IBM 2212 Models 40x A 10 2212 Service and Maintenance...
Page 122: ...Assembly 6 Final Assembly IBM 2212 Models 45x A 12 2212 Service and Maintenance...
Page 124: ...Assembly 7 Final Assembly IBM 2212 Models 4xx A 14 2212 Service and Maintenance...
Page 126: ...Assembly 8 Final Assembly IBM 2212 Models 4xx A 16 2212 Service and Maintenance...
Page 130: ...A 20 2212 Service and Maintenance...
Page 138: ...D 2 2212 Service and Maintenance...
Page 166: ...E 28 2212 Service and Maintenance...
Page 195: ......
Page 197: ...Spine information 2212 Access Utility Service and Maintenance Manual...