
4.
If
you
are
using
the
SurePOS
100
Ethernet
port,
install
a
communications
cable
(not
shipped
with
your
unit)
into
the
connector
port.
5.
Install
signal
cables
for
other
input/output
(I/O)
devices
into
the
correct
cable
ports.
This
includes
the
cash
drawer
that
attaches
to
the
SurePOS
100.
6.
Check
that
all
signal
and
all
power
cables
are
installed
in
the
cable
ports.
7.
Install
the
power
cord,
shipped
with
your
unit,
into
the
connector
for
system
unit
power.
Important:
Do
not
plug
the
power
cord
into
a
power
source
outlet
or
receptacle
until
directed
to
do
so,
such
as
when
preparing
the
printer
for
use
as
described
below.
8.
Replace
the
rear
cover.
9.
Prepare
the
printer
(impact
or
thermal)
by
loading
the
ribbon
cartridge
and
paper
roll.
To
install
the
ribbon
for
the
impact
printer,
refer
to
“Loading
the
Impact
Printer
Ribbon”
on
page
27.
Ensure
that
the
ribbon
is
routed
properly
through
the
head.
10.
Load
the
paper
roll
into
the
printer.
Refer
to
“Loading
the
Impact
Printer
Paper”
on
page
28
and
“Loading
Thermal
Printer
Paper”
on
page
30
respectively
for
the
printer
installed
on
your
unit.
Be
sure
that
the
paper
is
routed
correctly
through
the
paper
guide
path,
past
the
head,
and
that
the
paper
exits
with
enough
extra
paper
to
feed
through
the
printer
cover.
11.
The
installation
is
now
completed.
Go
to
Chapter
5,
“Installation
Testing
and
Problem
Analysis,”
on
page
37
and
test
the
SurePOS
100
to
be
sure
it
is
operating
correctly.
Installation
Instructions
July
27,
2007
-
Approval
Draft
12
4613
SurePOS
100
Point-of-Sale
Terminal:
Installation
and
Operation
Manual
Summary of Contents for 4613 SurePOS
Page 2: ......
Page 65: ...IBM IBM GA27 4004 GA27 4004 July 27 2007 Approval Draft Appendix D Safety information 53 ...
Page 81: ......