TroubleShooting Checklist
If you locate the problem, execute the POST again by unplugging the power cord
from the wall outlet and then plugging it in again. If the LEDs indicate a successful
power-on and the IBM 2210 was pre-configured at the factory, your installation is
complete; if the IBM 2210 was not pre-configured, continue with Chapter 4,
“Performing the Initial Configuration” on page 19.
If you cannot determine the problem, call your service representative.
Table 3. Troubleshooting Checklist
Symptom
Action
No LEDs are on
¹
Make sure the power cord is plugged into an
outlet
¹
Verify that your power outlet is good
The system LED (OK) is green,
but a port LED is amber
If you are not using the port with the amber LED
on, you may continue.
If you are using the port:
¹
Make sure the cable for that port is securely
connected
¹
Contact the network administrator to make sure
the network is set up correctly
Adapter status LED is OFF
¹
Is the adapter enablement feature installed?
¹
Check for correct power cables?
¹
Check the adapter slot power supply.
¹
Check the adapter.
¹
Contact IBM service.
14
2210 Install and Initial Config
Summary of Contents for 2210
Page 1: ...2210 Nways Multiprotocol Router Installation and Initial Configuration Guide GC30 3867 01...
Page 2: ......
Page 3: ...2210 Nways Multiprotocol Router Installation and Initial Configuration Guide GC30 3867 01...
Page 10: ...viii 2210 Install and Initial Config...
Page 38: ...22 2210 Install and Initial Config...
Page 40: ...24 2210 Install and Initial Config...
Page 64: ...48 2210 Install and Initial Config...
Page 66: ...50 2210 Install and Initial Config...
Page 71: ......