STEP 1
Make sure the softener tank is empty and clean.
STEP 2
Install the distributor tube in the softener tank, check the height in relation to top of softener
tank. (Approximately 12mm above the top of the tank).
STEP 3
Place a plastic cap over the end of the distributor pipe. A clean rag or plastic bag will suffice if
plastic cap is not available -
NO
media must enter distributor pipe.
STEP 4
Place a wide mouth funnel in the mouth of the tank and FIRST load the No.6 gravel (16kg.)
and then the 100 litres of softening resin and fill with water to within 50mm of the top.
Note :- The resin
must not
be allowed to be spilled on the floor as it is very slippery and
dangerous to walk on.
STEP 5
Clean top of neck and threads of all traces of gravel and resin. Remove the plastic cap fitted
in Step 3 taking care not to raise the distributor pipe.
NEVER
shorten the length of the
distributor pipe.
STEP 6
Unpack control valve, check that tank ‘O’ ring is in place.
Fit the top strainer into the
bottom of
the valve
if not already fitted. The strainer has a bayonet style connection end.
Assemble the control valve to softener tank, and screw down hand tight.
STEP 7
Connect inlet, outlet pipes and drain line to control valve as per Instruction Booklet.
STEP 8
Remove lid from brine tank, connect brine tube from elbow assembly on control valve, to
brine riser tube in brine tank. Then connect brine overflow drain line to waste trap.
STEP 9 Load the 2 bags of No.4 Gravel (40kg.) evenly around the bottom of the brine tank and level
off, making sure the slotted distributor pipe in the brine tank bottom is covered by the gravel.
STEP 10
Load ten bags of 25kg high purity water softener salt into brine tank and replace lid.
STEP 11
Refer to Instruction booklet for start up procedure (placing conditioner into Service")
NOTE: The INLET PIPE connection is on the right hand side as viewed
from the front of the valve. The top strainer must be fitted into underneath
the valve.
Table 3
MODEL
RESIN LITRES
BRINE TANK - SALT
LOADING KG
AS14100MP-CL
100
250
BASIC INSTALLATION
OF
IBC TWO TANK WATER SOFTENER SYSTEM
Summary of Contents for AS14100MP-CL
Page 3: ...AS14100MP CL Page 3...
Page 10: ...AS14100MP CL Page 10 MODEL AS14100MP WATER SOFTENER WITH CONTROL VALVE SERIES MODEL WS1EI...
Page 18: ...AS14100MP CL Page 18...
Page 19: ...AS14100MP CL Page 19 WS1EI Screen Display Information And Programming Instructions...
Page 21: ...AS14100MP CL Page 21 General Regeneration Error Screens Status...
Page 28: ...AS14100MP CL Page 28 SPARE PARTS AND SERVICING INSTRUCTIONS...
Page 38: ...AS14100MP CL Page 38 flow diagram backwash Flow Diagram Downflow...
Page 39: ...AS14100MP CL Page 39 flow diagram downflow brine Flow Diagrams Rinse and Fill...
Page 40: ...AS14100MP CL Page 40 flow diagram rinse flow diagram fill WS1 Wrench Order No V3193 01...
Page 48: ...AS14100MP CL Page 48 INJECTOR PERFORMANCE CURVES...
Page 49: ...AS14100MP CL Page 49...
Page 51: ...AS14100MP CL Page 51...