
6.
Move the lift truck away from the carriage.
Completely lower the inner mast so it cannot
move.
7.
Connect a lifting device to the carriage. Remove
the load from the forks with another lift truck.
Lower the carriage to the floor so the load roll-
ers are facing up.
8.
If the forks are removed, use a lifting device to
put the carriage on the floor so the load rollers
are up.
HANG-ON SIDESHIFT CARRIAGE,
REMOVE
1.
Lower the carriage completely. Remove the
forks and the load backrest extension.
A.
HYDRAULIC CONNECTIONS - TWO-STAGE,
FULL FREE-LIFT AND THREE-STAGE, FULL
FREE-LIFT
B.
HYDRAULIC CONNECTIONS - TWO-STAGE,
LIMITED FREE-LIFT
1. TOP BEARING
2. CYLINDER SUPPORT BRACKET
3. THREADED ROD
4. SHIM
5. SIDESHIFT CYLINDER
6. GREASE FITTING
7. UPPER APRON
8. BOTTOM BEARING
9. LOWER APRON
10. LIFTING EYE
11. SHIM STRIP
Figure 12. Hang-On Sideshift Carriage
4000 SRM 1148
Carriages Repair
13