s
trong
a
rm
p
ark
d
C B
reaka
W
a
Y
a
rm
B
ra
C
ket
I
nst
alla
tI
on
Tools Requir
ed
•
Utility knife
•
Standar
d socket set
•
Standar
d hex key set
To r
eview the installation video, scan the QR code with your cell phone or
click on the following link:
http://bit.ly/br
eakawayinstall
Youtube video location:
https://youtu.be/AdTWNYcC-NU
In a short 8 minutes, the installation video shows you how to:
1.
Install the br
eakaway arm bracket
2.
Connect the magnetic kill switch
3.
Connect the arm lighting and feed wir
e thr
ough the chassis to the contr
oller (5:50 min)
4.
Pr
ogram the contr
oller
, Installer Menu setting “BA” Br
eakaway switch.
To install the br
eakaway arm bracket onto the Str
ongArmPark DC, you can take
the steps shown her
e and view the video for additional step clarification.
Physical Stop
Bracket
fasteners (4x)
Top cover
DC power switch
AC power
switch
Fr
ont access
panel
HOLD
toggle
switch
Physical Stop
Bracket
Position Br
eakaway Arm
Bracket so the clamp
opening faces up.
Remove Physical Stop
Bracket (4 fasteners)
12
2
Connect the r
ed battery wir
e.
(Refer to step 4 in
the Installation
Instructions
.)
12
3
Pr
ess the DC switch ON and toggle
HOLD switch to Hold Open.
12
1
Make sur
e AC and DC power switches
ar
e in the OFF position.
12
4
After GA
TE OPEN appears on the
display
, turn the DC power switch OFF
.
Display
12
5
12
6
Secur
e clamp to drive shaft
using the fasteners pr
ovided.
12
8
Slide the clamp onto the drive
shaft. Align gear teeth as you
slide clamp against chassis.
12
7
HYSECURITY
GA
TE OPEN
OPEN
CLOSE
ST
OP
MENU
RESET
PREV
NEXT
SELECT
NOTE:
Follow the video to feed wir
e harness thr
ough chassis, assemble
barrier arm, connect lighting and pr
ogram the gate operator
.
NOTE:
You may need to loosen the collar bolt & nut to
position the clamp. Re-tighten when spline properly set .
Spline collar
bolt & nut
84
MX3650-01 Rev. D
StrongArmPark DC Programming & Operations
© 2017
www.hysecurity.com