Using A Solar Powered Operator
2-8
SlideSmart Installation and Reference Manual
Revision C
127(
For extended battery backup installation instructions, refer to
Installing the Extended Battery
Backup Kit
.
6. Slide the plastic cover off the control box and attach the red spade connector to the battery terminal on the
upper DC power switch.
7. Turn both DC power switches ON and program the Smart DC Controller. See
Programming the Initial
Setup Menu
.
24VDC
)LJXUH
Control Box
DC Battery & Motor
switch (OFF)
DC Solar Panel
switch (OFF)
Input & ground wires
Red spade
connector
All manuals and user guides at all-guides.com
all-guides.com