Maintenance
5-38
HPR400XD Auto Gas –
806160
Manual pump operation
1. Go to the CNC screen that turns on the pump manually (refer to the operation instructions for the CNC being used).
If the selection console shows coolant flow error 093, the pump must be turned on manually within 8 seconds of
turning on the power supply, or the power will have to be turned off and then on again.
2. Turn ON the power. Turn ON the pump manually, and allow the coolant to flow for 60 seconds.
3. Write down the coolant flow rate on the CNC screen. The recorded flow rate will be used for comparison during
some of the tests. Coolant flow must be greater than 2.3 lpm (0.6 gpm) for the system to operate.
Note: A flow diagram can be found on schematic 013374, sheet 19 of 24
Summary of Contents for HyPerformance HPR400XD
Page 1: ...HyPerformance Plasma HPR400XD Auto gas Instruction manual 806160 Revision 4 ...
Page 26: ...Specifications 2 2 HPR400XD Auto Gas 806160 ...
Page 48: ...Installation 3 10 HPR400XD Auto Gas 806160 ...
Page 53: ...Installation HPR400XD Auto Gas 806160 3 15 Horizontal RHF mounting Vertical RHF mounting ...
Page 57: ...Installation HPR400XD Auto Gas 806160 3 19 This page is blank intentionally ...
Page 65: ...Installation HPR400XD Auto Gas 806160 3 27 7 8 8 7 ...
Page 100: ...Installation 3 62 HPR400XD Auto Gas 806160 ...
Page 107: ...Operation HPR400XD Auto Gas 806160 4 7 Diagnostic screen ...
Page 108: ...Operation 4 8 HPR400XD Auto Gas 806160 Test screen ...
Page 109: ...Operation HPR400XD Auto Gas 806160 4 9 Cut chart screen ...
Page 197: ...Operation HPR400XD Auto Gas 806160 4 97 ...
Page 287: ...7 4 HPR400XD Auto Gas 806160 Discrete output functionality ...
Page 347: ...Appendix B CNC Interface Protocol b 28 HPR400XD Auto Gas 806160 ...
Page 355: ...4 HPR400XD Auto Gas 806160 ...