Step
Procedure
8.1
Fig. S
Bolt the Counterweight (4666110) to the end of the Upper Tank Band using the same
fasteners as the Mooring. One kit is needed per Mooring Post to help counterbalance
the lift (this adds 4” of width to Fig. A.
8.2
Slide the Cover over the Counterweight.
Assembly
Sec. 3 Pg. 1
Assembly
Sec. 6 Pg. 13
HydroHoist International, Inc.
Model: 9/12/15/17B
Publication: 8/24/04
Fig. S
BOLT BAG - 6922200
COUNTERWEIGHT
4666110
PIPE STAND COVER
5203000
COUNTERWEIGHT - BIG B MODEL - KIT
6022200
1 KIT NEEDED PER MOORING
ADDS 4” TO LIFT WIDTH
Counterweight
Summary of Contents for Side-Tie 12B
Page 10: ......