Assembly
Sec. 6 Pg. 4
HydroHoist International, Inc.
Model: 9/12/15/17B
Publication: 8/24/04
Hull Support Columns
Fig G2
Fig. G1
Step
Procedure
2.1
Fig. G1 represents the hull support column assembly for the 9000 and 12000 B-Model
and Fig. G2 represents the hull support column assembly for the 15000 and 17000 B-
Model.
NOTE: All models use the hull support column assembly shown in Fig. G1 for the
Vee Bracket assembly on the front frame of the hoist.
2.2
Fig. G1
Place the Upper Pad Support [8A] on the frame in its approximate position with the
square tube portion of the part facing the front of the hoist. Bolt the Lower Pad Sup-
port [7] to the Upper Pad Support [8A] using a 1/2” x 2 1/2” bolt.
Used: 9/12B = 6-1/2” x 2 1/2” bolt
15/17B = 2-1/2” x 2 1/2” bolt
2.3
Fig. G2
Bolt the 2 Pad Mount Weldment [8C/8D] to the frame through the long slotted hole
using a 5/8” x 5 1/2” bolt. Position the Weldment Brace [9] in between the 2 Pad
Mount Weldments [8C/8D] and bolt using 5/8” x 1 1/2” bolts.
Used: 15/17B = 4-5/8” x 5 1/2” bolt
16-5/8” x 1 1/2” bolt
2.4
Fig. G1
Fig. G2
Bolt the Upper 2” Tube [5] to the Pad Mount Weldment [8D] or the Upper Pad Sup-
port [8A] using a 5/8” x 3 1/2” bolt.
Used: 9/12/15/17B = 6-5/8” x 3 1/2” bolt
NOTE: None of these bolts need to be fully tightened at this time.
Summary of Contents for Side-Tie 12B
Page 10: ......
Page 31: ...T WOT A N KH O I S T S H O S ED I A G R A M F O U RT A N KH O I S T S...
Page 36: ......