Site Preparation
Sec. 5 Pg. 1
Inspect
The boat slip, dock or seawall to which the hoist will be installed.
♦
The structure should be of good, sturdy construction capable of maintaining a secure
mooring for the hoist.
♦
The
9, 12, 15, and 17B
require a minimum water depth of
6’6”
in which to operate.
Confirm that there is sufficient water depth at all times of the year.
♦
Check for underwater obstructions, such as structural braces, cables, rocks, or sunken
objects which will interfere with the hoist’s operation.
♦
Check for overhead obstructions and confirm that sufficient clearance exists for the lifting
of the boat.
♦
Confirm that electrical supply is available and sufficient for hoist operation.
♦
Confirm that sufficient dock space is available for mooring the hoist and boat.
♦
CONFIRM THE BOAT HULL CONFIGURATION -
Boats with a stepped hull design, or with through-the-hull apparatus, may require special
positioning or alteration of the Hull Support Pads. Contact HydroHoist Engineering De-
partment if proper hull support is in question.
Verify
The Boat Stall or Mooring Location.
♦
If the hoist is being installed in a commercial marina or multi-slip boat dock, confirm the
correct mooring location for hoist and boat.
The boat specifications.
♦
Make ____________________________
♦
Model ___________________________
♦
Length _____________
♦
Beam ______________
♦
Dry Weight of boat ________ lbs.
♦
Fuel: _____ gal. @ 6.6 lbs./gal. = ______ lbs.
♦
Water: ____gal. @ 7.5 lbs./gal. = ______ lbs.
♦
Gear estimated @ 8% of boat’s dry weight ______lbs.
♦
Other equipment or weight ________ lbs.
♦
TOTAL LIFTING WEIGHT _____________ LBS.
Site Preparation
End of Section 5
HydroHoist International, Inc.
Model: 9/12/15/17B
Publication: 8/24/04
Summary of Contents for Side-Tie 12B
Page 10: ......
Page 31: ...T WOT A N KH O I S T S H O S ED I A G R A M F O U RT A N KH O I S T S...
Page 36: ......