Step
Procedure
1.6
Fig.
F
If building a 4 tank lift bolt the 24” Tank Band [11B] to the Frame [12] with 1/2” x 6”
bolts as shown.
Used: 15B = 8-1/2” x 6” bolts
17B = 12-1/2” x 6” bolts
NOTE: width of the hoist assembly determines which set of holes on the frame are
used for these tank bands. If building the assembly in its narrowest possible posi-
tion, use the inside set of holes.
1.7
Bolt the 24” Lower Tank Bands [10B] to the 24” Tank Bands [11B] using a 7/16” x
2” bolt as shown.
DO NOT TIGHTEN
Used: 15B = 16-7/16” x 2” bolts
17B = 24-7/16” x 2” bolts
Inner Tanks
& Tank Bands
Assembly
Sec. 3 Pg. 1
Assembly
Sec. 6 Pg. 3
HydroHoist International, Inc.
Model: 9/12/15/17B
Publication: 8/24/04
Fig. F
Summary of Contents for Side-Tie 12B
Page 10: ......
Page 31: ...T WOT A N KH O I S T S H O S ED I A G R A M F O U RT A N KH O I S T S...
Page 36: ......