
Assembly
Sec. 6 Pg. 6
HydroHoist International, Inc.
Model: 9/12/15/17B
Publication: 8/24/04
Fig. I
Step
Procedure
3.1B
Fig. I
Place the Pad Mount Receiver [6] into the Hull Pads [3] and bolt using a 1/2” x 5”
bolt.
Used: 15/17B= 16-1/2” x 5” bolts
3.2B
Place the Hull Pads [3] (with the receiver bolted in place) onto the Upper 2” Tube [5]
as shown. Bolt the Upper 2” Tube [5] to the Pad Mount Receiver [6] using a 5/8” x 3
1/2” bolt.
Used: 15/17B= 4-5/8” x 3 1/2” bolts
NOTE: The tank band settings given in Fig. B are correct for the Hull Pad system
oriented as shown.
Hull Pad Support
System & Hull Pads
15/17B
Summary of Contents for Side-Tie 12B
Page 10: ......
Page 31: ...T WOT A N KH O I S T S H O S ED I A G R A M F O U RT A N KH O I S T S...
Page 36: ......