![HydroHoist Side-Tie 12B Installation Manual Download Page 24](http://html1.mh-extra.com/html/hydrohoist/side-tie-12b/side-tie-12b_installation-manual_2192190024.webp)
Assembly
Sec. 6 Pg. 8
HydroHoist International, Inc.
Model: 9/12/15/17B
Publication: 8/24/04
Fig. K
Step
Procedure
5.1
VERY IMPORTANT:
Sight across the frames and verify that the frames are paral-
lel and there is no twisting in the hoist. If the lift is un-level shim underneath the
tanks until it is perfectly level. Verify that the tank band settings are still correct and
then tighten all of the bolts installed on the hoist to the torque specifications listed on
Pg.1.
5.2
Fig. K
Once the lift is leveled and tightened down apply the tar strips located in the lifts main
parts bag to the tank directly under the Upper Tank Bands [11A]. To do this clean the
bottom of the tank in this area and place the “tacky” side of the tar strip slowly to the
bottom of the Tank [1]. Using a round object (like the 15/16” deep well socket) press
hard and slide the object all along the paper on the opposite side of the tar strip. The
longer this is done the easier it is to remove the paper from the tar strip. Peel the pa-
per back slowly, making sure to keep the “tar” on the tank. When the paper is re-
moved the Lower Tank Band [10A] can be positioned underneath the Upper Tank
band [11A]. Bolt the Lower Tank Band [10A] to the Upper Tank Band [11A] using a
7/16” x 2” bolt.
Used: 2AF = 16-7/16” x 2” bolts
3AF = 24-7/16” x 2” bolts
Lower Tank Bands
Summary of Contents for Side-Tie 12B
Page 10: ......
Page 31: ...T WOT A N KH O I S T S H O S ED I A G R A M F O U RT A N KH O I S T S...
Page 36: ......