
ZT-5400 Powertrain
35
From Opposite Direction
11
12
10
14
16
17
15
13
6
7
1
4
8
3
2
5
9
figure 27, screw tightening sequence
Starting with the number “1” screw location, tighten sequentially through to “17.”
Torque each screw to 230 – 290 lb-in (25 .9 – 32 .7 Nm) .
NOTE:
As a general rule, use the low end of
the torque specification.
sIde HOusInG – sCrew TIGHTenInG seQuenCe
www.mymowerparts.com
Hydro Gear Parts or New Units Call 606-678-9623 or 606-561-4983