
26
ZT-5400 Powertrain
144
145
143
142
141
38
146
CHarGe pump and OIl Tube
figure 18, Charge pump
Refer to Figure 18
disassembly
1 . Remove all external items previously dis-
cussed in their recommended order .
2 . Pry out the oil tube (38) .
3 . Mark the orientation of the charge pump
cover (144) .
4 . Remove the charge cover screws (145),
the cover (144) and the gerotor (142),
then remove and discard the O-ring (143) .
5 . Remove the gerotor and the charge tubes
(141) .
6 . Remove and discard the O-ring (146)
Inspection
1 . Inspect items of the charge cover assem-
bly for wear and or damage .
Replace if necessary .
assembly
1 . Reassemble all parts in the reverse order
of disassembly .
2 . When installing the charge pump cover
(144) line up the mark on the cover with the
mark on the housing — refer to Disassembly
step 3 .
3 . When tightening the fasteners, refer to the
table on page 15 for the required torque
values .
4 . Place a small dab of sealant on each end
of the oil tube (38) just before the bend . The
sealant should contact the inside of the side
housing when it is installed .
www.mymowerparts.com
Hydro Gear Parts or New Units Call 606-678-9623 or 606-561-4983