Performing Maintenance
OXiStop OXS-LID
en
Page 66 / 112
MoWa OXS-LID 3992764e en-us 2018-08-10.docx
2018-08-10
Manual bleeding during commissioning (optional/accessories)
The free air can be removed rapidly from the tank during commissioning with
the aid of the "Connection kit for rapid bleeding for OXS"
Ball valve "closed" Ball valve "open"
1.
Fully unscrew the screw plug (B.22) on the valve block to bleed air
from the hydraulic tank and apply the "Connection kit for rapid
bleeding for OXS" at this position.
2.
Unscrew the screw plug (Z1) on the connection kit completely and
open the ball valve (Z2).
3.
Attach an air pump to the free end of the ball valve (G 1/2).
4.
Use the air pump to remove the free air until an oil column has
formed in the sight glass (Z3).
5.
Close the ball valve (Z2).
6.
Reattach the screw plug (Z1).