Preparing the CTU for operation
CTU 2xxx series
en-US
Page 28 / 108
BeWa CTU2000 3160738h en-us 2018-11-15.docx
2018-11-15
Preparing the CTU for operation
Setting up the CTU
Make sure that the CTU is on a level, horizontal surface.
Make sure that the CTU is at least 5 cm from the wall or devices located at
the back, that there is enough space (
≥ 0.5 m) between the suction filter and
room ceiling and that the EMERGENCY STOP button, main switch and filter
membrane holder are freely accessible at all times.
Make sure that the cleanliness of the surrounding area, the ambient air and
the temperature at the installation location are similar to laboratory
conditions.
CAUTION
"G 60 Spezial" test fluid
Hazardous to health
►
Make sure that there is adequate ventilation.
►
Always wear protective gloves.
►
Always wear eye protection.